Construction Projects

Following is a list of major construction projects including related documents that will or have taken place in the San Pedro coast area.

Click on the links with (pdf) to download documents. Construction schedules are shown in italics. Check back often for updated information.

25TH STREET DRAINAGE IMPROVEMENT (SAN RAMON CANYON) (expected schedule: June 17, 2016 – January 31, 2017) This project is proposed to improve the street drainage system at 25th Street and San Ramon Canyon near the Rancho Palos Verdes (RPV) and City’s border. Work scope includes the reconstruction of 120′ of curb & gutter as well as a drainage system that would mitigate the local flooding problems, improve the driving safety during a rain storm, and thereby benefiting both RPV and City’s residents. Documents:  Project Info (pdf), 2015-11-02 25th Street Construction Schedule (pdf), 2011-01-11 San Ramon Canyon Project Study Report (pdf)

ANGEL’S GATE PARK (expected schedule: September 19, 2018 – March 16, 2021) Master Plan Implementation. The Proposition K specified line item is “Implementation of master plan improvements and perimeter fencing.” Perimeter fencing was completed as Phase I of the project. Phase II will include implementation of the master plan improvements. DocumentsProject Info 2016-02-01

CLEARWATER PROJECT at Royal Palms (mid-2019 to mid-2021)  Construction of a new onshore tunnel for treated sewage will be constructed and connected to the existing ocean outfalls by the Los Angeles County Sanitation District. Figueroa/Western to Royal Palms tunnel alignment; construction of the Joint Water Pollution Control Plant West and Royal Palms shaft sites; the existing ocean outfall manifold interconnection; and the rehabilitation of the existing ocean outfalls. DocumentsClearwater Program website (link), 2012-11 Final Executive Summary (pdf)

GAFFEY STREET POOL & BATHHOUSE (expected schedule: December 11, 2014 – June 30, 2017) A complete restoration of the existing historical 50’x100′ pool and replacement of complete mechanical system to meet current health, safety and building codes. Upgrade ADA access and construct new bathhouse, pool decks, pool equipments, landscaping, driveway and disabled access parking spaces. DocumentsProject Info 2016-02-01

HAMILTON AVENUE WIDENING (expected schedule: October 25, 2016 – August 24, 2017) Widen the north side of Hamilton Ave by 18′ between Patton Ave and Barbara Street (850 LF) with curb, gutter, sidewalk, street pavement, and street trees to meet standard street dimensions for a local street. Documents2015-11-02 Construction Schedule (pdf), 2014-06-03 Notice of Public Hearing (pdf)

WHITE POINT LANDSLIDE on Paseo del Mar (expected schedule: November 3, 2019 – November 1, 2021) A landslide severely damaged Paseo Del Mar. To improve immediate stability of the existing slopes immediate measures must be taken to reduce the potential threat to right of way and public safety. This project will remove pavement adjacent to the landslide, grade the site around the landslide for proper drainage, and construct semi-permanent turn-arounds for improved traffic mitigation on Paseo Del Mar. This project will re-grade the landslide and provide a structure to support the re-establishment of the Paseo Del Mar alignment.

City/County Reports
2016-10-26 Notice of Preparation (pdf)
2016-10 Initial Study (pdf)
2016-03_Status Report (pdf)
2016-01-04_Signed_Public_Hearing_Notice (pdf)
2016-02-01 Restoration Project Information (pdf)
2016-02-01 Earthwork Project Information (pdf)
2015-11-02 Construction Schedule (pdf)
2015 Paseo Del Mar (White Point) Permanent Restoration Project Information Report (pdf)
2015 White Point Landslide-Earthwork/Street Improvement Project Information Report (pdf)
2014-12-10 As-Bid Plans (pdf)
2014-09-26 Ground Anchor Construction Observation Report
2014-08-21 Geotechnical Instrumentation Report (pdf)
2014-08 Status Report (pdf)
2014-07-03 Data Report for Boring B-12 (pdf)
2014-07-02 Geotechnical Construction Observation Report – Dewatering Drains (pdf)
2014-07-01 Slope Stability Evaluation – Ground Anchor Construction Area (pdf)
2014-06-27 Ground Anchor Load Testing Report.pdf (pdf)
2013-12-26 Ground Anchor Performance Testing Report (pdf)
2013-10-22 Slide Presentation (pdf)
2013-10-02 Status Report (pdf)
2013-08 Status Report (pdf)
2013-07 Status Report (pdf)
2013-05 Status Report (pdf)
2013-04-17 Final Addendum Geotechnical Report No. 2 – Ground Anchor Design (pdf)
2013-04 Status Report (pdf)
2013-03 Status Report (pdf)
2013-02-26 Slide Presentation (pdf)
2012-12-19 Construction As-Built Report for 11/1/12 through 12/18/12 – Interim Grading
2012-12-19 Final Addendum Geotechnical Report No. 1 (pdf)
2012-11 Status Report (pdf)
2012-10-09 Geotechnical Design Report – Interim Grading Plan (pdf)
2012-10-02 Slide Presentation (pdf)
2012-08-15 Final Geotechnical Engineering Report
2012-08-08 Response to Questions (pdf)
2012-06-18 Slide Presentation (pdf)
2012-03 Status Report (pdf)
2012-02-29 Status Report (pdf)
2012-02 Status Report (pdf)
2012-01-23 Slide Presentation (pdf)
2012-01-06 Draft Preliminary Geotechnical Report (Main Body, Appendix A – Field Activity Reports) (pdf)
2012-01 Status Report (pdf)
2011-12-21 StatusReport.pdf (pdf)
City/County Websites regarding the landslide
Coordinated Agency Recovery Effort (C.A.R.E.)

L.A. Bureau of Engineering – White Point Landslide Status
Petitions
Deny Funding for the Road to Nowhere
Rebuild Paseo del Mar

Last revised: November 8, 2016